In Table 1, page 167461
In Table 1, page 167461
-water quality is not covered in Choupin et.al. 2021;
-water quality is not covered in Choupin et.al. 2021.
-distance to shore appears to be covered in the calculations of the indexes EDRI and ERDI, see equation 3 in Choupin etal 2021;
 
-distance to shore appears to be covered in the calculations of the indexes EDRI and ERDI, see equation 3 in Choupin etal 2021.
 
-distance to the power grid appears to be covered in both EDRI and ERDI, see Figures 4 and 5 in Choupin etal 2021.
-distance to the power grid appears to be covered in both EDRI and ERDI, see Figures 4 and 5 in Choupin etal 2021.

Revision as of 14:11, 14 July 2022

Target Article

C. -N. Wang, N. -L. Nhieu, H. -P. Nguyen and J. -W. Wang, "Simulation-Based Optimization Integrated Multiple Criteria Decision-Making Framework for Wave Energy Site Selection: A Case Study of Australia," in IEEE Access, vol. 9, pp. 167458-167476, 2021. https://doi.org/10.1109/ACCESS.2021.3134656.

Improperly-Cited-Article

O. Choupin, F. Pinheiro Andutta, A. Etemad-Shahidi, R. Tomlinson, A decision-making process for wave energy converter and location pairing, Renewable and Sustainable Energy Reviews, Volume 147, 2021, 111225, ISSN 1364-0321, https://doi.org/10.1016/j.rser.2021.111225.

Corrections

In Table 1, page 167461 -water quality is not covered in Choupin et.al. 2021.

-distance to shore appears to be covered in the calculations of the indexes EDRI and ERDI, see equation 3 in Choupin etal 2021.

-distance to the power grid appears to be covered in both EDRI and ERDI, see Figures 4 and 5 in Choupin etal 2021.