Editing Simulation-Based Optimization Integrated Multiple Criteria Decision-Making Framework for Wave Energy Site Selection: A Case Study of Australia
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 14: | Line 14: | ||
== Corrections == | == Corrections == | ||
In Table 1, page 167461 | |||
-water quality is not covered in Choupin et.al. 2021. | |||
-distance to shore appears to be covered in the calculations of the indexes EDRI and ERDI, see equation 3 in Choupin etal 2021. | |||
-distance to the power grid appears to be covered in both EDRI and ERDI, see Figures 4 and 5 in Choupin etal 2021. |